Complete construction work, the building structure for the chemical stores casted in situ concrete foundations with reinforced concrete block walls and roof slab with blast roof, an eyewash provided to each chemical store room, with a common hose bib located externally, an acid drain system shall be provided to a holding tank, installed 250 CMU walls, apply paint to all exterior and interior walls surfaces.

February 5, 2017

GCTC WIP-I Aindar-min

Complete construction work, the building structure for the chemical stores casted in situ concrete foundations with reinforced concrete block walls and roof slab with blast roof, an eyewash provided to each chemical store room, with a common hose bib located externally, an acid drain system shall be provided to a holding tank, installed 250 CMU walls, apply paint to all exterior and interior walls surfaces.