info@gcec.com.sa

+966 138351657

It includes construction work i.e. Re drilling, detect and remove the pipes to extinguish the fire at King Fahd University Damam. Remove and re-asphalting with planning marking positions in the King Fahd Causeway. Replacement of old firefighting system and rehabilitation of 300 m3 fine water tank & pumping system.

February 2, 2017

KFU

It includes construction work i.e. Re drilling, detect and remove the pipes to extinguish the fire at King Fahd University Damam.

Remove and re-asphalting with planning marking positions in the King Fahd Causeway.

Replacement of old firefighting system and rehabilitation of 300 m3 fine water tank & pumping system.

Leave a Reply

Your email address will not be published. Required fields are marked *