Project of Saudi Electricity Company Project Description

Removing and installing the existing 230kv 3-phase old disconnect switches with steel structure, Replace the existing two disconnect D702 & D713, DC panel installation at control room, AC,DC & control cable laying and termination as per cable routing , packing & transporting of old disconnect switches with related structure support, repair existing civil foundation.

Client: US Air Force

February 5, 2017

GCTC Saudi Electricity-min (1)

Removing and installing the existing 230kv 3-phase old disconnect switches with steel structure, Replace the existing two disconnect D702 & D713, DC panel installation at control room, AC,DC & control cable laying and termination as per cable routing , packing & transporting of old disconnect switches with related structure support, repair existing civil foundation.