GCTC completed its contract with SAUDI ARAMCO by installation of Cathode Protection Bonding Stations. The Company fabricated foundations, posts and install magnesium anode complete with the required rigid conduit, marker plats, excavation, cad weld & termination at all road crossing from SHAYBAH NGL KM Zero to KM633. It installed magnesium anodes and 3-pin stations for all blowdown line thrust anchors. Excavation and compaction.